Hurrah! The new Sellwood Bridge opened today! Aaaaaand it only took one dumb dum-dum to fuck up a good thing. According to multiple reports, traffic was a goddamn nightmare around the new bridge thanks to (I’m going to be charitable here) a very confused person who thought the sidewalk was the road, and got his truck stuck in between a concrete barrier and a guard rail. And then? ABANDONED THE TRUCK. Workers—who had successfully opened the bridge hours before schedule— were forced to shut down the bridge for over an hour while they used machinery to extricate the truck. ON THE FIRST DAY!
Well, the truck has been moved and the Sellwood Bridge should be back open soon. #LiveOnK2 #pdxtraffic pic.twitter.com/e4eH26IKDu
— Evan Bell (@evanbellKATU) March 1, 2016
Happily, the new Sellwood bridge is back in full operational mode—as long as people stop driving on the goddamn sidewalk. Seriously, this is not Florida, people!

It was a woman.